Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/18373
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorChuquin Vasco, Juan Pablo-
dc.contributor.authorNaranjo Cantos, Washington Marcelino-
dc.date.accessioned2023-03-01T15:03:54Z-
dc.date.available2023-03-01T15:03:54Z-
dc.date.issued2022-11-30-
dc.identifier.citationNaranjo Cantos, Washington Marcelino. (2022). Repotenciación y recalibración del banco de pruebas de sistemas de bombeo (serie y paralelo) del laboratorio de turbomáquinas de la Facultad de Mecánica de la ESPOCH. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/18373-
dc.descriptionEl presente trabajo técnico tiene como propósito repotenciar y recalibrar el banco de pruebas de sistemas de bombeo (serie y paralelo) del laboratorio de turbomáquinas de la Facultad de Mecánica de la ESPOCH. Para poner en funcionamiento el banco de pruebas se determinaron los elementos dañados, los elementos con desperfectos; los soportes de las tuberías estaban desoldados; la bancada estaba despintada; varios elementos se encontraban con suciedad como: recipiente reservorio, interior de las tuberías, se comprobó que los elementos electrónicos se encontraban en buen estado. Para la sustitución de los elementos dañados se verificó que estuvieran bien seleccionados, detectándose que el rotámetro de 40 LPM no era el indicado para medir el caudal cuando las bombas funcionaban en paralelo, por lo cual fue sustituido por un rotámetro de 100 LPM. Se generó el plano mecánico de conjunto del banco de pruebas en SolidWorks; se determinaron puntos de carga en base al caudal, para graficar las curvas características de la bomba y resistentes de cada sistema para realizar la recalibración en LabVIEW y enviar todos los datos que recogen los sensores y transductores a un archivo Excel que procesa estos valores y entrega una ecuación polinómica de segundo grado que describe cada sistema. Al igualar las ecuaciones características con las ecuaciones resistentes se determinó el punto de funcionamiento. Se concluye que al asociar bombas de las mismas características en serie hay un aumento de carga y si las bombas se asocian en paralelo hay un aumento de caudal, al ser comparadas con el punto de funcionamiento cuando opera una sola bomba. Se recomienda retirar el agua del tanque reservorio luego de cada práctica y si el banco de pruebas va a permanecer inutilizado hay que girar las partes móviles de las bombas varias veces por semana.es_ES
dc.description.abstractThe purpose of this technical work is to repower and recalibrate the pumping systems test bench (series and parallel) of the turbomachinery laboratory of the Faculty of Mechanics of ESPOCH. To put the test bench into operation, the damaged elements, the elements with damages, were determined; pipe supports were unwelded; the bench was unpainted; Several elements were found to be dirty, such as: reservoir container, interior of the pipes, it was verified that the electronic elements were in good condition. For the replacement of the damaged elements, it was verified that they were well selected, detecting that the 40 LPM rotameter was not the one indicated to measure the flow when the pumps worked in parallel, for which it was replaced by a 100 LPM rotameter. The mechanical drawing of the test bench was generated in SolidWorks; Load points were determined based on the flow, to graph the characteristic curves of the pump and resistance of each system to perform the recalibration in LabVIEW and send all the data collected by the sensors and transducers to an Excel file that processes these values and delivers a quadratic polynomial equation that describes each system. By equating the characteristic equations with the resistant equations, the operating point was determined. It is concluded that when associating pumps with the same characteristics in series there is an increase in load and if the pumps are associated in parallel there is an increase in flow, when compared to the operating point when only one pump operates. It is recommended to remove the water from the reservoir tank after each practice and if the test bench is to remain unused, the moving parts of the pumps must be rotated several times a week.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTFM;15T00835-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectREPOTENCIACIÓNes_ES
dc.subjectRECALIBRACIÓNes_ES
dc.subjectBANCO DE PRUEBASes_ES
dc.subjectBOMBAS CENTRÍFUGASes_ES
dc.subjectTURBOMÁQUINASes_ES
dc.titleRepotenciación y recalibración del banco de pruebas de sistemas de bombeo (serie y paralelo) del laboratorio de turbomáquinas de la Facultad de Mecánica de la ESPOCHes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.contributor.miembrotribunalMoreano Sánchez, Gabriel Vinicio-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Ingeniero/a Mecánico/a

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
15T00835.pdf3,64 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons