Por favor, use este identificador para citar o enlazar este ítem:
http://dspace.espoch.edu.ec/handle/123456789/8798
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Morales Noriega, Adriana Margarita | - |
dc.contributor.author | Llulluna Guastay, Delida Karina | - |
dc.date.accessioned | 2018-09-11T20:56:41Z | - |
dc.date.available | 2018-09-11T20:56:41Z | - |
dc.date.issued | 2018-03-29 | - |
dc.identifier.citation | Llulluna Guastay, Delida Karina. (2018). Diseño de un plan integral de riesgos en la COAC San Martín de Tisaleo Ltda. provincia de Tungurahua, año 2017. Escuela Superior Politécnica de Chimborazo. Riobamba. | es_ES |
dc.identifier.uri | http://dspace.espoch.edu.ec/handle/123456789/8798 | - |
dc.description | El objetivo del trabajo de titulación es el diseño de un Plan Integral de Riesgos en la COAC San Martín de Tisaleo Ltda., provincia de Tungurahua, año 2017 con el fin de mejorar la administración de riesgos de forma eficiente y efectiva, a más de cumplir las establecidas por la Intendencia de Riesgos de la EPS, SFPS y la Dirección Nacional de Riesgos del Sector Financiero Popular y Solidario de identificar, medir, priorizar, controlar, mitigar, monitorear y comunicar los diferentes tipos de riesgos, a la cual se encuentra expuesta la Institución. Para el desarrollo del tema propuesto se ha utilizado la herramienta de encuestas, con el propósito de recolectar información verídica y confiable de la Cooperativa, el resultado obtenido permitió conocer la situación actual de la Institución, se determinó que necesita contar con una plan de riesgos, se encuentra en el segmento 4 por lo que abordará los siguientes riesgos: concentración de créditos, depósitos, liquidez, solvencia y morosidad ; siendo los riesgos principales a analizar por la COAC el riesgo crediticio y de liquidez. Finalmente se concluyó que los riesgos que enfrenta la Cooperativa de Ahorro y Crédito San Martín de Tisaleo Ltda., son favorables y están dentro de un límite bajo, teniendo una liquidez del 10.48%, lo que indica que la Cooperativa es confiable en el período 2017, se recomienda que la misma aplique el presente Plan Integral de Riesgos para mitigar el riesgo. | es_ES |
dc.description.abstract | The main purpose of this study is to design an Integral risk plan in the COAC, San Martín de Tisaleo Ltd., Tungurahua province during t 2017 to improve risk management in an efficient and effective way. Besides, this study seeks to comply with the regulations established by the risk management of the EPS, SFPS and the National Risk Department of the popular and solidarity financial sector in order to identify, measure, prioritize, control, mitigate, monitor, and communicate the different types of risks to which the institution is exposed. For the development of the proposed topic, the surveys were used as a tool in order to collect truthful and reliable information coming from the cooperative. The findings made possible to know the current situation of the institution, and it was determined that it needs to have a risk plan. The institution is in segment 4, so it will address the following risks: concentration of credits, deposits, liquidity, solvency, and payment delay; the main risks to be analyzed by the COAC are credit and liquidity risks. Finally, it was concluded that the risks faced by the savings and credit cooperative San Martín de Tisaleo Ltd., are favorable and they are in a low limit, having a liquidity of 10.48%, which demonstrates that the cooperative was reliable during 2017, it is recommended that the institution implements this integral risk plan to reduce risks. | es_ES |
dc.language.iso | spa | es_ES |
dc.publisher | Escuela Superior Politécnica de Chimborazo | es_ES |
dc.relation.ispartofseries | UDCTFADE;12T01180 | - |
dc.subject | CIENCIAS ECONÓMICAS Y ADMINISTRATIVAS | es_ES |
dc.subject | PLANIFICACIÓN | es_ES |
dc.subject | PLAN INTEGRAL DE RIESGOS | es_ES |
dc.subject | MOROSIDAD | es_ES |
dc.subject | LIQUIDEZ | es_ES |
dc.subject | TISALEO (CANTÓN) | es_ES |
dc.title | Diseño de un plan integral de riesgos en la COAC San Martín de Tisaleo Ltda. provincia de Tungurahua, año 2017 | es_ES |
dc.type | bachelorThesis | es_ES |
dc.contributor.miembrotribunal | Esparza Paz, Franqui Fernando | - |
Aparece en las colecciones: | Ingeniero de Empresas; Licenciado/a de Empresas |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
12T01180.pdf | 3,03 MB | Adobe PDF | Visualizar/Abrir |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.