Por favor, use este identificador para citar o enlazar este ítem:
http://dspace.espoch.edu.ec/handle/123456789/2496
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.advisor | Echeverría, Magdy | - |
dc.contributor.author | Aguaiza Iza, Luis Fabián | - |
dc.contributor.author | Guerrero Rodríguez, Mateo Alejandro | - |
dc.date.accessioned | 2013-07-16T19:34:13Z | - |
dc.date.available | 2013-07-16T19:34:13Z | - |
dc.date.issued | 2013-07-16T19:34:13Z | - |
dc.identifier.citation | Aguaiza Iza, Luis Fabián; Guerrero Rodríguez, Mateo Alejandro. (2013). Diseño de un sistema de gestión ambiental para el Complejo Industrial TUBASEC C.A. Riobamba. Escuela Superior Politécnica de Chimborazo. Riobamba. | es_ES |
dc.identifier.uri | http://dspace.espoch.edu.ec/handle/123456789/2496 | - |
dc.description | Se ha realizado el diseño de un Sistema de Gestión Ambiental (SGA) basados en los requerimientos de la Norma ISO 14001: 2004 para el Complejo Industrial TUBASEC C.A., organización localizada en la cuidad de Riobamba dedicada a la fabricación de cubiertas y artículos de asbesto-cemento, cubiertas de polipropileno y tejas de hormigón con los nombres comerciales de Eurolit, Techoluz y Ecuateja respectivamente. La metodología de la presente investigación cuali - cuantitativa fue de manera preliminar el desarrollo de la Revisión Ambiental Inicial (RAI) con la finalidad de evaluar la situación actual de la empresa con relación al ambiente, paralelamente mediante métodos analíticos conocer la afectación en términos cuantitativos hacia la calidad del agua, aire y nivel sonoro, para ello se ha realizó los respectivos análisis mediante la contratación de servicios del “Laboratorio de Análisis Ambiental e Inspección” LAB -CESTTA. Así pues con dicha información técnica e identificación de los puntos críticos de control se procedió a evaluar los impactos ambientales generados utilizando la matriz de Leopold modificada donde el consumo de energía eléctrica y generación de desechos solidos afectan con el 27%, el consumo de agua con el 10%, emisión de ruido con el 8% consumo de combustibles fósiles (gas licuado de petróleo) con el 6%. Se estableció el alcance del SGA, la Política Ambiental, y consecutivamente los demás requerimientos dentro del proceso continuo de Planificar, Hacer, Verificar y Actuar (PHVA con la elaboración de programas ambientales, procedimientos e instructivos que han sido documentados en el Manual de Gestión Ambiental y el respectivo Manual de Procedimientos. La empresa ejecuta buenas prácticas de gestión ambiental y su afectación al medio ambiente es mínima su presencia y ejecución productiva favorece al desarrollo socio- económico de la cuidad de Riobamba y del país, por ello la implantación del SGA debe ser inmediata al fin de dar alcance a los aspectos. | es_ES |
dc.description.abstract | The design of an Environmental Management System (EMS) based on the requirements of ISO 14001: 2004 has been carried out for the Industrial Complex TUBASEC C.A., an organization located in the city of Riobamba dedicated to the manufacture of asbestos-cement roofing and articles, polypropylene roofing and concrete tiles under the trade names of Eurolit, Techoluz and Ecuateja respectively. The methodology of this quali-quantitative research was preliminarily the development of the Initial Environmental Review (RAI) in order to assess the current situation of the company in relation to the environment, in parallel by analytical methods to know the affectation in quantitative terms to the quality of water, air and sound level, for it has made the respective analysis by hiring the services of the "Laboratory of Environmental Analysis and Inspection" LAB -CESTTA. With this technical information and identification of the critical control points, the environmental impacts generated were evaluated using the modified Leopold matrix, where electricity consumption and solid waste generation account for 27%, water consumption for 10%, noise emissions for 8%, and fossil fuel consumption (liquefied petroleum gas) for 6%. The scope of the EMS, the environmental policy, and other requirements were established as part of the continuous Plan, Do, Check, and Act (PHVA) process with the development of environmental programs, procedures, and instructions that have been documented in the Environmental Management Manual and the corresponding Procedures Manual. The company implements good environmental management practices and its impact on the environment is minimal. Its presence and productive performance favor the socioeconomic development of the city of Riobamba and the country; therefore, the implementation of the EMS must be immediate in order to address the issues. | es_ES |
dc.language.iso | spa | es_ES |
dc.publisher | Escuela Superior Politécnica de Chimborazo | es_ES |
dc.relation.ispartofseries | UDCTFC;236T0077 | - |
dc.rights | info:eu-repo/semantics/openAccess | es_ES |
dc.subject | GESTIÓN AMBIENTAL | es_ES |
dc.subject | NORMA ISO 14001 | es_ES |
dc.subject | SISTEMAS DE GESTIÓN AMBIENTAL | es_ES |
dc.subject | DISEÑO DE SISTEMAS DE GESTIÓN | es_ES |
dc.subject | COMPLEJO INDUSTRIAL TUBASEC C.A. RIOBAMBA | es_ES |
dc.title | Diseño de un sistema de gestión ambiental para el Complejo Industrial TUBASEC C.A. Riobamba | es_ES |
dc.type | bachelorThesis | es_ES |
dc.contributor.miembrotribunal | Moreno, Jenny | - |
dc.contributor.miembrotribunal | Beltrán, Andrés | - |
dc.rights.uri | https://creativecommons.org/licenses/by-nc-sa/3.0/ec/ | es_ES |
Aparece en las colecciones: | Ingeniero/a en Biotecnología Ambiental; Ingeniero/a Ambiental |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
236T0077.pdf | 3,58 MB | Adobe PDF | Visualizar/Abrir |
Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons