Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/16489
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorArias Esparza, Jorge Enrique-
dc.contributor.authorCastillo Torres, Josselyn Lisseth-
dc.date.accessioned2022-08-10T16:44:48Z-
dc.date.available2022-08-10T16:44:48Z-
dc.date.issued2021-11-24-
dc.identifier.citationCastillo Torres, Josselyn Lisseth. (2021). Auditoría de gestión a los proyectos ejecutados por el Gobierno Autónomo Descentralizado parroquial rural de Alluriquín, cantón Santo Domingo, provincia de Santo Domingo de los Tsáchilas, período 2019. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/16489-
dc.descriptionEl objetivo del trabajo de titulación fue medir los niveles de eficiencia, eficacia y economía en la ejecución de los proyectos del Gobierno Autónomo Descentralizado Parroquial Rural de Alluriquín, Cantón Santo Domingo, Provincia de Santo Domingo de los Tsáchilas, periodo 2019. Para la investigación se utilizó la metodología cuantitativa mediante la aplicación de una encuesta dirigida a la máxima autoridad y a los servidores públicos para de esta manera conocer cuál es la situación por la que pasa la institución, además de ello se realizó un análisis de los procedimientos, la aplicación de métodos de evaluación tales como los indicadores de gestión y el método de control interno (COSO I) a través de los cuales se pudo determinar las diferentes debilidades que impiden el cumplimiento de los objetivos y las falencias del desarrollo de las actividades, también se pudo evaluar los procesos inmersos en la ejecución de proyectos. Por consiguiente, tras la aplicación de la auditoría se obtuvo como resultado que el GAD Parroquial Rural Alluriquín no cuenta con una planificación estratégica, el incumplimiento del plan de mitigación de riesgos, la inexistencia de respaldo de información, la falta de tecnología inadecuada, y la carencia de recursos humanos especializados. Se concluye con el informe final de auditoría, en donde se detallan las debilidades encontradas en las actividades y procedimientos relacionados con la ejecución de proyectos. Se recomienda aplicar una Auditoria de Gestión con más frecuencia para así tener un control específico sobre el cumplimiento de las obras, planes y proyectos, además de ello es importante que se tomen las medidas correctivas necesarias para la optimización de los recursos, y de igual manera realizar un seguimiento continuo tanto de las actividades, como del desempeño de los servidores públicos.es_ES
dc.description.abstractThe objective of this study was to measure the levels of efficiency, effectiveness and economy during the execution of projects at the Decentralized Autonomous Rural Parish Government of Alluriquín, (GAD) located in Santo Domingo, province of Santo Domingo de los Tsáchilas, period 2019. this study applied a quantitative methodology through the application of a survey addressed to the highest authority and public officials in order to know the situation of the institution. In addition to this, an analysis of the procedures was carried out, the application of methods of evaluation such as the management indicators and the internal control method (COSO I) to determine different weaknesses that prevent the fulfillment of the objectives and deficiencies during the development of activities. It was also possible to evaluate the processes immersed in the execution of projects. Therefore, after the application of the audit, it was obtained as a result that the Alluriquín Rural Parish GAD lacks of a strategic planning, the non- compliance of the risk mitigation plan, the non-existence of information support, the lack of inadequate technology, and the lack of specialized human resources. It concludes with the final audit report, where the weaknesses found in the activities and procedures related to the execution of projects are detailed. It is recommended to apply a permanent management audit in order to have a specific control over the fulfillment of activities, plans and projects. It is also important to take the necessary corrective steps to optimize resources and carry out continuous monitoring of both the activities and the performance of public employees.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTFADE;82T01185-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectAUDITORÍA DE GESTIÓNes_ES
dc.subjectCIENCIAS ECONÓMICAS Y ADMINISTRATIVASes_ES
dc.subjectANÁLISIS SITUACIONALes_ES
dc.subjectPROYECTOS EJECUTADOSes_ES
dc.subjectCONTROL INTERNOes_ES
dc.subjectINDICADORES DE GESTIÓNes_ES
dc.subjectALLURIQUÍN (PARROQUIA)es_ES
dc.subjectSANTO DOMINGO (CANTÓN)es_ES
dc.titleAuditoría de gestión a los proyectos ejecutados por el Gobierno Autónomo Descentralizado parroquial rural de Alluriquín, cantón Santo Domingo, provincia de Santo Domingo de los Tsáchilas, período 2019es_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.contributor.miembrotribunalSuárez Navarrete, Homero Eudoro-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Ingeniero/a en Contabilidad y Auditoría; Licenciado/a en Contabilidad y Auditoría

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
82T01185.pdf3,39 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons