Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/15971
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorAcosta Velarde, Jaime Iván-
dc.contributor.authorCousen Torres, Esteban Eduardo-
dc.date.accessioned2022-06-17T22:04:24Z-
dc.date.available2022-06-17T22:04:24Z-
dc.date.issued2021-06-02-
dc.identifier.citationCousen Torres, Esteban Eduardo. (2021). Automatización para el registro de tiempos en el balance de línea de soldadura para la producción del automóvil Great Wall M4, en la Empresa CIAUTO Ambato. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/15971-
dc.descriptionEl presente trabajo tiene como objetivo la implementación de un sistema de automatización para el registro de tiempos en el balance de línea de soldadura para la producción del automóvil Great Wall M4, en la empresa CIAUTO Ambato; aplicando gráficas de control de producción en la planta, con el fin de dar mayor fluidez en el proceso productivo y sistemas de alerta ANDON para alertas de retrasos. El estudio parte del balance de línea de producción, realizado con el método tradicional de recolección de datos que maneja la planta, mediante la observación científica estructurada, se realizó un control de tiempos en la línea de producción del automóvil Great Wall M4 para obtener tiempos tipo y gráficas de control. Posteriormente, se diseñó el Sistema ANDON, para detectar retrasos en la producción. El registro de tiempos es accionado mediante pulsos eléctricos controlados por un PLC LOGO en cada una de las estaciones de trabajo, capturando el tiempo de operación para el control de la línea al finalizar la producción diaria, descargando los datos registrados por el sistema y enviando una visualización HMI web a tiempo real para conocer el estado de la producción. Durante el proceso de recolección de tiempos tradicional, se obtuvo un takt time de 0h:33min:28s, un incremento de la productividad en un 12% tomando como base al número de unidades totales producidas diarias, mejorando la calidad en 1.19%, con respecto al método tradicional de toma de tiempos, al añadir un operador a las estaciones SM4-1 y SM4-2. Los beneficios que obtiene la planta con la instalación de este sistema son: desarrollo de balances de línea con rapidez, información del estado actual de la producción y equilibrar las cargas de trabajo mediante la implementación del Sistema ANDON. Además, se recomienda mantener en condiciones óptimas del sistema: voltaje y corriente, debido a que una sobrecarga o cambio en estas variables afectan directamente al controlador deteriorando sus entradas o fallas en la lectura del sistema.es_ES
dc.description.abstractThe aim of this work is the implementation of an automation system for time recording in the welding line balance for the production of the Great Wall M4 automobile, in the company CIAUTO Ambato; applying production control charts in the automotive workshop, in order to give greater fluidity in the production process and ANDON systems for delay alerts. The study starts from the balance of the production line, carried out with the traditional method of data collection that manages the automotive workshop, by means of structured scientific observation. Furthermore, a time control was carried out on the production line of the Great Wall M4 automobile to obtain standard times and control graphs. Subsequently, the ANDON system was designed to detect delays in production. The time recording is generated by electrical pulses controlled by a LOGO PLC at each of the workstations, capturing the operating time for line control at the end of daily production, downloading the data recorded by the system and sending a web HMI display in real time to know the status of production. During the traditional time collection process, a takt time of 0h: 33min:28s was obtained, an increase in productivity of 12% based on the number of total units produced per day, improving quality by 1.19%, with respect to the traditional time collection method, by adding an operator to the SM4-1 and SM4-2 stations. The benefits that the automotive workshop obtains with the installation of this system are: fast development of line balances, information on the current status of production and balancing workloads by implementing the ANDON System. In addition, it is recommended to maintain optimal system conditions: voltage and current, because an overload or change in these variables directly affect the controller by deteriorating its inputs or failures in the reading of the system.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTFM;85T00653-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectTECNOLOGÍA Y CIENCIAS DE LA INGENIERÍAes_ES
dc.subjectSISTEMA DE AUTOMATIZACIÓNes_ES
dc.subjectREGISTRO DE TIEMPOSes_ES
dc.subjectPRODUCCIÓNes_ES
dc.subjectSISTEMA ANDONes_ES
dc.titleAutomatización para el registro de tiempos en el balance de línea de soldadura para la producción del automóvil Great Wall M4, en la Empresa CIAUTO Ambatoes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.contributor.miembrotribunalGarcía Cabezas, Eduardo Francisco-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Ingeniero Industrial

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
85T00653.pdf3,61 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons