Por favor, use este identificador para citar o enlazar este ítem: http://dspace.espoch.edu.ec/handle/123456789/14487
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorJácome Valdez, Marcelo Antonio-
dc.contributor.authorOrdóñez Delgado, José Mauricio-
dc.contributor.authorSalazar Valarezo, Dennis Alexis-
dc.date.accessioned2021-05-10T23:58:49Z-
dc.date.available2021-05-10T23:58:49Z-
dc.date.issued2020-08-06-
dc.identifier.citationOrdóñez Delgado, José Mauricio; Salazar Valarezo, Dennis Alexis. (2020). Elaboración e implementación de un plan integral de gestión de riesgos laborales en el edificio administrativo A, bloque B y bodega en el Gobierno Autónomo Descentralizado Municipal del Cantón Joya de los Sachas ubicado en la provincia de Orellana. Escuela Superior Politécnica de Chimborazo. Riobamba.es_ES
dc.identifier.urihttp://dspace.espoch.edu.ec/handle/123456789/14487-
dc.descriptionEl presente proyecto técnico permitió elaborar e implementar un Plan Integral de Gestión de Riesgos (PIGR) laborales en el Gobierno Autónomo Descentralizado Municipal Cantón La Joya de los Sachas (GADMCJS). En el análisis de la situación inicial del Gobierno Autónomo, se usó una lista de chequeo diseñada en base a los componentes de un plan integral establecidos por la Secretaria Nacional de Gestión de Riesgo y Emergencia (SNGRE) y se determinó el porcentaje de cumplimiento de cada una de las fases, el mismo que fue inferior al 80%. Para la evaluación de riesgos se aplicó las metodologías del Instituto Nacional de Seguridad e Higiene en el Trabajo (INSHT) y Sistema simplificado de evaluación de riesgos de accidente (NTP 330), en donde se determinó que se debe implementar un plan de control de riesgos. En cuanto a la identificación de amenazas y vulnerabilidades el personal se encontraba expuesto a sismos, erupciones volcánicas e incendios debido a la presencia de vulnerabilidades físicas como espacio reducido, instalaciones eléctricas inadecuadas, señalización insuficiente, no se manejaba protocolos de actuación para emergencias y no contaban con un presupuesto para afrontarlas, etc. Por tal motivo se implementó el plan integral, organizando y capacitando las brigadas de emergencia. Finalmente se evaluó la eficiencia del plan mediante un simulacro de sismo de 6,7 grados que dejó una persona herida donde se desarrollaron los protocolos establecidos para las brigadas correspondientes. Adicionalmente, se evaluó el porcentaje de cumplimiento de cada una de las fases que debe poseer un plan integral según lo establece la SNGRE, y se determinó que la gestión de riesgos actual es eficaz con un porcentaje superior al 80% en cada fase, es decir el personal del municipio está preparado y capacitado para afrontar una situación de emergencia.es_ES
dc.description.abstractThis technical project allowed the elaboration and implementation of a Comprehensive Work Risk Management Plan (CWRMP) in the Autonomous Decentralized Municipal Government of La Joya de los Sachas Canton (ADMJSC). In the analysis of the initial situation of the Autonomous Government, a checklist designed based on the components of a comprehensive plan established by the National Secretariat for Risk and Emergency Management (NSREM) was used and the percentage of compliance with each was determined. one of the phases, the same one that was less than 80%. For risk assessment, the methodologies of the National Institute for Occupational Safety and Hygiene (NIOSH) and the Simplified Accident Risk Assessment System (NTP 330) were applied, where it was determined that a risk control plan should be implemented. Regarding the identification of threats and vulnerabilities, the personnel were exposed to earthquakes, volcanic eruptions and fires due to the presence of physical vulnerabilities such as reduced space, inadequate electrical installations, insufficient signaling, protocols for action were not used for emergencies and they did not have with a budget to face them, etc. For this reason, the comprehensive plan was implemented, organizing and training the emergency brigades. Finally, the efficiency of the plan was evaluated by means of a 6.7-degree earthquake simulation that left an injured person where the protocols established for the corresponding brigades were developed. Additionally, the compliance percentage of each of the phases that a comprehensive plan must have as established by the NSREM was evaluated, and it was determined that current risk management is effective with a percentage higher than 80% in each phase, that is, the municipal staff are prepared and trained to face an emergency situation.es_ES
dc.language.isospaes_ES
dc.publisherEscuela Superior Politécnica de Chimborazoes_ES
dc.relation.ispartofseriesUDCTFM;85T00577-
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.subjectTECNOLOGÍA Y CIENCIAS DE LA INGENIERÍAes_ES
dc.subjectGESTIÓN DE RIESGOSes_ES
dc.subjectBRIGADAS DE EMERGENCIAes_ES
dc.subjectCONTROL DE RIESGOes_ES
dc.subjectPROTOCOLOS DE EMERGENCIAes_ES
dc.subjectMÉTODO MESERIes_ES
dc.titleElaboración e implementación de un plan integral de gestión de riesgos laborales en el edificio administrativo A, bloque B y bodega en el Gobierno Autónomo Descentralizado Municipal del Cantón Joya de los Sachas ubicado en la provincia de Orellanaes_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
dc.contributor.miembrotribunalCayán Martínez, Juan Carlos-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-sa/3.0/ec/es_ES
Aparece en las colecciones: Ingeniero Industrial

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
85T00577.pdf4,92 MBAdobe PDFVista previa
Visualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons